168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Spr 2019 cbrc: interior renovation of lobby for existing commercial space of a 6 story commercial building. all work as per plans. (occupancy: b; const. type: iiia)
Spr 2019 cbrc: alterations and change of occupancy from r-3 to r-2 of existing 2-story building with basement and unfinished atic rectory building to convert to a 9 dwelling units…
Spr - 2019 cbc - interior renovation of existing 8 dwelling units and 1 commercial space at existing 8 dwelling units 3-story brick building w/basement (occupancy class m & r-2, co…
Permit expires on 03/05/2027 erection starts: 3/23/2026, erection ends: 3/01/2027. spr 2019 cbc: proposed temporary 65 x 80 x 25 tent for construction site support, safety huddles,…
Self-cert 2019 cbrd: interior alteration of a second floor tenant space in an existing eight-story mixed-use (office/residential) building. no change to demising walls or common ar…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Existing 1 story commercial tenant space interior build-out for restaurant.
In-kind replacement of exterior windows and doors in existing openings. replacement windows: 7; replacement skylights: 0; replacement doors: 2. affects: 0 residential unit(s), 1 no…
In-kind replacement of exterior windows and doors in existing openings. replacement windows: 6; replacement skylights: 0; replacement doors: 1. affects: 0 residential unit(s), 1 no…
Direct developer services 2019 cbc install caissons only for 7 story residential building with 45 standard dwelling units and 5 efficiency units ground floor retail space and 11 in…
In-kind replacement of exterior windows and doors in existing openings. replacement windows: 16; replacement skylights: 0; replacement doors: 2. affects: 0 residential unit(s), 1 n…
2019 cbc self cert: interior renovation of an existing ground floor tenant space to expand an existing donut restaurant within an existing two-story mixed-use building (type ii-a c…
Self-cert 2019 cbrc. interior alteration of existing corridors and restrooms on the 8th floor of an existing office space in an 8 story commercial building. no change in occupancy…
Self-cert 2019 cbrc: alterations of existing office space, suite 2100. interiors work only. no work to egress system. (occupancy group b-business; type 1a construction)
Self-cert 2019 cbrc: interior alterations to existing 8th floor office space. no change to existing use. (occupancy b/ construction type 1a)
Self-cert 2019 cbc: proposed 4 story/8 unit residence, 6' front iron/6' side wood fences, trash enclosure, and attached 3 car garage (1 ada) and 5 space parking pad, per plans. typ…
Dds 2019 cbc: work is for conversion of 7-story with basement masonry, steel frame, and heavy timber type iv construction mixed use retail / office building to a retail / residenti…
Fire alarm: modification of existing system. associated building permit:101058689. affects: 0 dwelling units; 1 non-residential units. high-rise building: no. voice communication:…
Dds 2019 cbc: revision to permit 101068757. revisions to the angle and spacing for the tiebacks, lowering of bottom of sheet piles, and eliminating 2nd row of tiebacks for the perm…
Spr 2019 cbc - proposed 2 story/2 unit residence w/basement, front deck, side 6' wood/front 6' iron fences, and 2 space parking pad, per plans.**certified corrections subject to fi…
Self-cert 2019 cbrc: interior alterations to existing 27th and 28th floor office space to include the removal of an internal connecting stair. no change to existing use. structural…