Search Building Permits
5,396 permits · Roofing · NY
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of temporary roof protection/overhead protection as per plan. no change in use, egress, or occupancy. the roof protection and overhead protection at the east neighbor's roof. the ovh over...
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy. the pipe scaffold on broadway and 5th avenue elevation from the top of the sidewalk shed past the main roof...
Installation of temporary roof protection per plan. no change in use, egress, or occupancy. the roof protection at neighbor roof at 109 washington street and 110 greenwich street.
Filing for tenant-in-place window and roof replacement, and storefront repair/replacement to meet ADA requirement. No change in egress, zoning, use, or occupancy.
Mechanical work on Roof
Installation of new roof framing for a roof terrace. no change in use, occupancy or egress.
Heat Pump Installation; includes removal and replacement of existing condensers and air handlers. Installation of New Steel Dunnage at the Roof to accommodate new, smaller condensers. No change in use...
provide new 100 gallon rooftop fuel storage tank w/ containment for hand fill as indicated on plans & per BB 2011-001 for buildings constructed prior to 1968. No change to use, egress or occupancy.
Facade repairs and roof replacement. No change in egress, use or occupancy.
Alteration to Floors Cellar, 001-008, and Roof with change to certificate of occupancy per plans filed herewith.
Installation of solar panels, rooftop, railed, grid-tied, 19 modules, 8.265kw
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Facade repairs and minor roof repairs as per plans filed herewith. no change to use, egress or occupancy.
Wall removal and replacement in conjunction with replacement of existing chiller on the roof. mechanical and structural work filed as subsequent. no change in use, egress or occupancy under this appli...
Construction of steel dunnage framing for proposed roof top units. application filed in conjunction with m01260395-i1 (gc), m01327973-i1 (pl) and m01327873-s1 (ms).
Replace existing chiller on the roof, as per plans. gc and str. work filed separately. no change in use, egress, or occupancy under this application.
Remove and install new walk-in frezer. Construct gyp. bd chase on 2nd, 3rd, and 4th floor. Install new condenser unit on roof.
Remove and install new walk-in frezer. Construct gyp. bd chase on 2nd, 3rd, and 4th floor. Install new condenser unit on roof.
Disconnect existing rooftop unit from gas supply line, electricpower & duct system. remove existing rooftop units. install packaged gas rooftop units on existing dunnage support. connect new rooftop u...