14,149 permits matching "hvac"
New Construction single-family residential 2-story 3 bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio.
New construction of 3 story SFR with 3-5 beds 2.35-4 baths recreation room covered patio 1st and 2nd floor and covered entry with 2 car attached garage
bathroom remodel for residential buildings (no structural changes)MECHANICAL, ELECTRICAL, AND PLUMBING INCLUDED
Ms subsequent filing for job# x01338009-i1 for 1st floor zaxby restaurant. modify existing rtu & hvac and kitchen exhaust system thru roof. no change i use, egress or occupancy.
Mechanical Work
Provide new mechanical system throughout four-story building, in conjunction with alt-1 application#x00490244-i1
Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: X00992202 and related application: VT -X00992202-S3.
Boiler Replacement for Building heating Confort only not for drinking.
Remove (1) one existing boiler, (1) hot water heater, (2) two new boilers and (2) hot water heaters, Replace existing plumbing three-piece fixture with new three-piece fixtures. Replace existing sink...
Installation of a New Second Gas Boiler
Installation of new split hvac ductless cassette systems on the 1st floor & condensers at the 2nd floor roof terrace with assoicated piping as per the drawings filed herein.
Replacement of an existing water heater Replaced gas tankless water heater
Replacement of complete existing central heat and air system with or without duct work Replacement of 4 Ton AC System **Include the replacement of 4 Ton AC System upstairs (there will be 2 4 Ton AC Sy...
New 2-story duplex unit A 3 bed/2.5 bath attached garage covered porch and balcony
install mechanical equipment as per plans
New construction of a 2-Story Single Family Res. [5 bed 5.5 bath] covered patio guest bedroom/bathroom suite attached via covered patio attached 3-car garage.
Replacement of complete existing central heat and air system with or without duct work
Adding a mini split
Tenant fit out to existing office. work include general construction and mechanical work. no change to use egress or occupancy.
Install new boiler and h.w.h. in the existing 3 story building. plumbing works as per plan. no change in egress, use, or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com