3,954 permits · Demolition
Hand demo of 2 story detached house, 28' high
FILING FOR DEMOLITION OF METAL STAIR FROM 22nd TO 23rd FLOOR. INFILL OF EXISTING SLAB OPENING ON 23rd FLOOR WITH NEW SLAB CONSTRUCTION SUPPORTED BY STEEL BEAMS.
Use of mechanical demolition equipment during Phase 1 Damrosch Park alteration, filed separately under M01314553.
Minor Demolition of the mechanical system on the Cellar, 1-5 Floors as per plans. No change to use, egress or occupancy
Temporary construction fence for the full demolition
Hand demo of detached, 1 story detached garage, 13' high
Non-DCE-Standard- Standalone:1215/Nutmeg - MIDWAY-PACIFIC HIGHWAY : Right- Of -Way permit for proposed demolition of accessory structures, installation of parking bollards and a pedestrian pathway to...
interior demolition of non-bearing partitions in the existing doctors' office.
Partial demolition work in coordination with proposed Alt Co as per plans filed.
Demo the (e) sfd and detached garage
General construction modifications with interior demoliation taking place on the 8th fl as per drawings filed herewith. no change in use, egress or occupancy.
Demo (e) duplex and detached garage
Hand demo of a 2 story detached residence, 28' high
Mechanical equipment use during full demolition of 2-story building in conjunction with demo filing q01233326-i1
Temporary construction fence for the full demolition
Full demolition of 2 story w/ cellar masonry building. all as per plans.
Demolish existing multi-family building per plan
Hand demo of a 1 story detached accessory shed/garage , 13' high
Interior Non-Structural Demolition
Interior renovation consisting of demolition and construction of non-load bearing partitions & lighting. No change in use, egress or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com