3,954 permits · Demolition
Full hand demolition of a 2 1/2 story frame building using handheld devices. foundation to be removed using mechanical means
Selective demolition and reconfiguration of existing single story building for change in use to market, including new restrooms and platform lift
Proposed new construction fence filed in conjuntion with demolition application. fence to be located at perimeter of the property as per plan (note: fence will remain for future construction of (3) ne...
Temporary bracing and partial demolition of 5 story building, as per plans filed herewith. This application is filed in conjunction with DOB#322109525.
Proposed minor demolition only to remove interior non-load-bearing partitions for existing 4-story 2-family residential building with cellar. no change in use, means of egress or occupancy in this app...
The proposed demolition is for 1 story masonry garage attached to another garage located within our property that is not attached to residential building. It's not attached to the neighboring building...
Interior renovation for commercial space with partition and mechanical work. all partition work and demolish work under alteration 1 job#b01238908. install kitchen hood system for proposed eating and...
Full demolition to a one story building
Filing for construction of wood fence in conjunction with demolition followed with reconstruction of existing 1-family dwelling at the subject premises
interior demolition
P.S. 44-K: Construction of an elevator bulkhead, elevator and elevator shaft, selection demolition and improvements within the existing building, including general construction work; and an exterior s...
Demolition & Construction of partitions, walls and floor finishes work throughout for existing Apts#7/8D. No change of use, egress or occupancy under this application
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Demolition of Existing Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes on Part of 2nd Floor. No Change to Occupancy, Use or Egress is Proposed
Total demolition
Interior renovation for commercial space with partition and mechanical work. all partition work and demolish work under alteration 1 job#b01238908. install kitchen hood system for proposed eating and...
Temporary bracing and partial demolition of 5 story building, as per plans filed herewith. This application is filed in conjunction with DOB#322109525.
The proposed demolition is for 1 story masonry garage attached to another garage located within our property that is not attached to residential building. It's not attached to the neighboring building...
Filed in conjunction with paa doc. 23 to alt1 job no. 121830439 and change of use on cellar and sub cellar from mercantile to health & fitness assembly; partial demoltion and interior renovation as pe...
Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spa...
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com