168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
New
Replace lintels & masonry repair 2020 msbc
Phase C02 - Units - Phase C02 - Units HC Accessible Unit: 216 Unit #s 202, 204, 206, 208, 210, 212, 214, 215, 217, 218
Phase C06 - Units - Phase C06 - Units HC Accessible Unit: 616 Unit #s 600, 602, 604, 606, 608, 610, 612, 614, 615, 617, 618, 619, 620, 621, 622, 623, 624, 625, 626, 627, 628, 630,…
MMF Trailhead - Swimming Pool - COS-003203 - Build New Swimming Pool for Community
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Phase C05 - Units - Phase C05 - Units HC Accessible Unit: 516 Unit #s 500, 502, 504, 506, 508, 510, 512, 514, 515, 517, 518, 519, 520, 521, 522, 523, 524, 525, 526, 527, 528, 530,…
Phase C04 - Units - Phase C04 - Units HC Accessible Unit: 416 Unit #s 400, 402, 404, 406, 408, 410, 412, 414, 415, 417, 418, 419, 420, 421, 422, 423, 424, 425, 426, 427, 428, 430,…
SPT 7th Annual Juneteenth Celebration - No Review Bldg Permit
add 2 posts at the west side facade corner window assembly for commercial unit. add center mullions to the 2 south side facade windows for commercial unit. ref 202604300430, 202603…
remodel lower level staff offices, meeting space and break area. certificate of occupancy required: no const type: 2b occupancy: E 2020 MSBC sprinklered: yes architect: wilson #511…
2nd phase of shell construction demising work certificate of occupancy required: no special inspections required: no const type: IIIB occupancy: B 2020 MSBC sprinklered: yes sac: 3…
New roof. (jjl)
Reroof -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC
Interior Remodel certificate of occupancy required: yes special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTIL…
Remove existing roofing. Install a new shingle roof system complete with required underlayment, flashing and trim.
exterior concrete restoration. architect: macdonald and mack
Tenant Improvement -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 49 sprinklered: yes Tenant: Cum…
ANTENNAS ON BUILDING Rated Exit Stair Enclosures are not allowed as a raceway for any of the installation 2020 Minnesota State Building Code
install new roof membrane and ballast.
Reroof - EPDM General requirements for flat roof replacements. The roof covering is to meet the Minnesota Building code performance requirements of Section 1504, the fire classific…