168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior renovation of retail space for restaurant. partial interior demolition and construction. new stair to cellar, partitions, fininsh floor, drywall ceiling, toilet, commercia…
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 9th floor as per plans. No change to use, egress or occupancy.
Partial demolition means & methods for portions of 2nd floor, mezzanine, 1st floor, escalator removal as per plans. this application is filed in conjunction with m01277980-s5.
Partial demolition,proposed horizontal enlargement, interior renovations and to change metes and bounds, two family to remain.
Demolition of 4th floor Mezz Slab and Two Columns Below it
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Interior non-structural demolition as shown on plans. Work to include the removal of partitions, doors and finishes.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 43rd & 44th floors (Ares- Buildout Phase) as per plans. No change to use, egress…
Full demolition of a 1-story building.
The scope of work consists of the demolition of the existing platform, hood, finishes, and selective walls. Install new washing and drying machines with water, gas, and venting sys…
Renovation of apartment#2B on the second floor, Work includes non-structural demolition and general construction as per plans filed herewith.
Interior renovation of two existing dwelling units, including partial non-structural demolition, installation of new flooring, relocation and renovation of kitchen and bathroom lay…
Fully demolition of existing two story house
Full demolition of existing 1 family building.
Full demolition of existing factory and industrial building.
Full demolition of a 1-story building.
Application filed for full demolition of the existing one-family house by using handheld equipment.
installation of constrcution fence to protect site, during full demolition
Hereby filing demolition of the space including all furnishings, finishes, interior framing and abandoned fit-out services. as shown on plans filed herewith. No change to use, occu…
Demolition of the interior of the existing tenant space and new bank fit out. there will be no change in use, egress, or occupancy.
demolish detached garage. On-site and off-site fill not to exceed 300 cubic yards.