Search Building Permits
2,860 permits · HVAC · NY
Install new air conditioning system in Apartment 4F, including (1) outdoor condensing unit, (3) indoor air handling units, refrigerant piping, drainage, and control system. All work per approved plans...
Replace (2) new low pressure steam boilers and (2) new combination nat gas/#2 oil burners. no change in means of egress, use group, or occupancy.
Remove existing fuel oil storage tanks as per plans. no change in use, egress or occupancy.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
Modifications to existing hvac system to match new tenant fir out
Renovation to existing apartment at cellar level. Replace windows and door. Partition, finish, fixture work. Replace HVAC system. No change to use, egress or occupancy.
Replacement of exhaust pipe for HVAC equipment. The structural work consists of providing supports for the exhaust pipe.
Application file for remove and replace existing hvac unit on existing dunnage and connect to ex. duct work.
Construct new elevator building addition. Provide new HVAC units with associated piping and ductwork for new building addition and accessible bathrooms throughout the building.
Installation of new hvac & erv systems associated with nb application filed under initial filing
Replace burner on existing boiler. change fuel from #2 oil to #2 oil and gas. new gas line being installed under separate pl application. no change in use, egress or occupancy.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
Application file for remove and replace existing hvac unit on existing dunnage and connect to ex. duct work.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
Renovation to existing apartment at cellar level. Replace windows and door. Partition, finish, fixture work. Replace HVAC system. No change to use, egress or occupancy.
Replace (2) new low pressure steam boilers and (2) new combination nat gas/#2 oil burners. no change in means of egress, use group, or occupancy.
Replacement of (3) existing air-cooled split HVAC systems, including associated ductwork and controls
install non bearing partitions to create storage room, enclose boiler and hot water heater room and create bathroom with w.c. and lav only. no change in use, egress or occupancy. plumbing to be filed...
Two new boilers and two new hot water heaters with associated ducts and piping.
Installation of (1) air conditioner unit, (2) erv and minor mechancial work as per plan