168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Sprinkler specifications filed in conjunction with gc application b01141294-i1
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this app…
Legalize 5 existing class a apartments b1, b2, b3, b4, b5 in basement of building (amended c of o to be obtained)
Filing for temporary construction fence
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Temporary structures for events at Skylight Refinery. Removed at the end of the programing. No changes to existing structures, use or egress.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Herewith filing for earthwork and foundation design for horizontal enlargements to an existing 2 family dwelling filed subsequent to architect application q01268246-i1
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Horizontal and vertical enlargement of an existing one family residence
Application herewith filed for construction fence at front perimeter. No change to use, egress or occupancy.
Installation of pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
8'-0 high plywood construction fence for work associated with gc application # b00980401-i1 & fd application b01084316-i1
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc
Installation of suspended scaffold for facade work or inspection
Job filed to show installation of new spronkler system as per plans attached herewith. no change in use, egress and occupancy.
20 lf curb cut fronting proposed 29-story building on roosevelt island
20 lf curb cut fronting proposed 29-story building on roosevelt island.
Filing for excavation on behalf of contractor
Proposed detached one (1) car garage - NYC Development HUB consultation held and accepted