Search Building Permits
4,653 permits · Pool & Spa
Sprinkler work as shown on plans filed herewith for BPCA space. No change to use, egress or occupancy.
Interior fitout of store space on the basement floor. Installation of new non-bearing walls. No change to egress, use, or occupancy.
Propose new illuminated signages for existing commercial space. no change to use, egress or occupancy.
Propose new illuminated signages for existing commercial space. no change to use, egress or occupancy.
Alteration of existing commercial space on 1st floor including new lighting and heat pump system. no change to egress, use, zoning.
Propose to install new non-illuminated stainless steel letters on aluminum raceway for existing commercial space at 1st floor. no change to use, egress or occupancy.
Submit temporary construction fence at open space, in conjunction with alt-co application #:b01357335-i1. no change in use, egress or occupancy.
Interior renovation of existing partial commercial space per plans.
Modification of existing sprinkler system for 14th floor office space. no change to use, egress or occupancy.
2019 cbrc self-cert interior remodel of former 1-story retail space to medical services/dental office non-ambulatory care facility. work includes 11 treatment rooms, 2 offices, reception, waiting, ste...
Eplan: Grading for removal of (E) Spa, shell and backfill with certified fill. Remove hardscape surrounding SPA.
Structural work in commercial space for new tenant build out for Alo per plans filed herewith. Work in include trellis support. No change in egress, use or occupancy.
Interior build out in existing commercial space for new tenant Alo. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed herewith. No change in egre...
Structural work for fit out of raw retail space (Target) filed in conjunction with NB # 421928953 with no TCO issued for said space
Interior renovation of an existing commercial space. No changes to use, egress, or occupancy.
Renovation work on existing commercial office space on 1st fl. new opening between building.partition work as per plans.
Interior renovation on existing commercial space. no change of use, egress or occupancy under this application.
Interior renovation of existing office space including the installation of partitions, doors, floors, and finishes on the 32nd Floor (Moroccanoil Office), as per plans. No change to use, egress, or oc...
Interior renovation of the school's lobby, gym and other accessory spaces. no change in zoning, occupancy or egress.
Interior Alteration of 1st FL retail space (Barber Shop), No change in use, occupancy, or egress.