168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Remove Wood Posts at 1st Fl & Intermediate Wood Bearing Beams & Joists at Underside 2nd Fl, Replace With Structural Steel at Underside of 2nd Fl, Install Wood Blocking Under 3rd Fl…
Application filed for replacement of rooftop units as per plans
Installation of (1) 12 ton roof top unit replacement on exact same existing steel dunnage & roof curbs.
Roofing replacement on the 4th setback and 5th floor main roofs as per plans filed herewith. No change in use, egress, or occupancy under this application.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Direct replacement of hvac unit at roof. no change to use, egress, or occupancy.
Roofing system replacement and associated work, partial parapet replacement, exterior masonry repairs.
Replacement of roofs, parapet, windows, window shades, window guards, metal panels, bulkhead doors, exterior masonry repair, concrete coating finish, caulking, plaster and painting…
Roof and attic renovation to resolve vacate order due to fire
Mechanical alterations at 1st, 2nd floors and roof, installation of emergency generator at 1st floor as indicated on drawings.
Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement with new railing. No change in use, egress…
Filing of mechanical work for 4th floor apartment with condensers at roof top. nop change in use , egress or occupancy
Replacement of roof membrane and insulation as per plans. There will be no change in use, egress, or occupancy.
Masonry restoration, waterproofing installation, masonry repair, at exterior envelope at all building elevations as per plans file dherewith. no change to use, egress or occupancy.
General construction and facade modifications taking place on floors 2-21 and roof as per drawings filed herewith. no change in use, egress or occupancy.
Install (1) new 3-way roof manifold, (1) new FHR, (1) new Fire hose valve and (4) sprinkler heads on the Roof; Install (65) new sprinkler heads and associated SP/SD piping on the 4…
Exterior work on building's facade and roof including new installation of guardrails as per plans filed herewith. no change to use, egress, or occupancy.
Install (1) new 3-way roof manifold, (1) new FHR, (1) new Fire hose valve and (4) sprinkler heads on the Roof; Install (65) new sprinkler heads and associated SP/SD piping on the 4…
General construction on floors 8 and Roof (including Clerestory and Bulkhead) as per plans filed herewith. No changes in use, egress or occupancy.
Installation of 300 psf sidewalk shed, plywood fence, yodocks with chainlink, overhead protection and roof protection as per plans. all equipment shall comply with chapter #33 of t…