16,224 permits · Roofing
Installation of solar panels, rooftop, grid tied, railed, 8 modules, 3.28 KW
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 18 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zo...
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___44___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VH...
Repair balconies, new framing, sheathing and waterproofing to units 3, 4, 5, and 6 as well a walkways
"Small lot subdivision pursuant to Tentative Tract No./Preliminary Parcel Map No. AA-2018-1653-PMLA-SL. A certificate of occupancy (temporary or final) shall not be issued until after the final map ha...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing _13____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (V...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 36 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___100___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(V...
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 43 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHS...
Remodel to (e) sfd at 1st floor to living room, den, bathroom ,storage and mechanical room, laundy room , server room , remodel at 2nd floor to combine (2) bedrooms into (1), split (1) bathroom into (...
Installation of temporary roof protection over adjacent properties as per plans. roof protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applic...
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Installation of solar panels, rooftop, railed, grid-tied, 26 modules, 10.66 kw
Remove and replacing shingles. Possible re-decking of roofs decking boards