5,372 permits · HVAC · NY
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Installation of 36,000 BTU single zone HVAC system in LAN room. No change to occupancy, use or egress.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Installation of ductless mini split system for heating and cooling as per plans filed herewith . no change in use egress or occupancy
Mechanical Systems work related to proposed new 5-story office building with bulkheads; related work as per plans.
Mechanical systems work for proposed new 1-story building with mezzanine as per plans.
Mechanical work as shown on the plans.
Modifications to existing mechanical system as per plans filed herewith.
relocate 3 diffusers /flex duct. No change to existing mechanical units.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Installation of ductless mini split system for heating and cooling as per plans filed herewith . no change in use egress or occupancy
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Modification to existing mechanical system as shown on drawings.
Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Application filed for mechanical additions/modifications on the 15th floor (techno) as per plans filed herewith. no change in use, egress, or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com