168,989 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Convert two-story entry to bathroom addition in a single dwelling unit subject to field inspection.
Tenant Improvement for offices at main floor northwest corner of existing commercial building occupy per plan.
Change of use from auto maintenance to retail per the land use code. Construct alterations to convert auto repair to a convenience store and maintain gas pumps and canopy occupy pe…
Construct alterations to existing religious institution per plan. Mechanical included
Construction fence in conjunction with New Building #B00775071-I1.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Wndws/doors
Plumbing work in conjunction with two story and attic horizontal enlargement
Installation and provisions of systems, equipment and services for a pre-k center, including electric cabinet unit heaters, perimeter electric wall pressed convectors,split system…
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Brick replacement and repointing.
Legalize shed/strgn
General plumbing modification for gas distribution as per plans filed herewith. No change to use, bulk, egress, or occupancy is proposed.
Kitchen drywall rp
Replacement of existing parapet walls on the roof, repair building facade, and replacement of (4) windows at the front facade. no change in use, egress, or occupancy.
Installation of two (2) replacement 10-ton rooftop packaged hvac units as per plans. no change in use, egress or occupancy.
Structural work, filed in conjunction with Alt-1 application.
Foundation work, filed in conjunction with Alt-1 application.
Propose plumbing work in conjucntion with arch design as per plan. no change in use, egress, or occupancy.
Subsequent application filed for mechanical modifications/additions on the 1st floor (stretch lab) as per plans filed herewith. no change in use, egress, or occupancy
Installation of plumbing fixtures as per the plans filed herewith. no change in use, occupancy or egress.