170,910 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
plumbing work in conjunction with the ot # M01348222-I1
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Remove the existing curb cut and restore original condition.address ecb violation 34566578k
New addn attached
Interior fit-out of existing space. no change of use, egress or occupancy under this application.
Filing for pipe scaffolding installation on behalf of contractor
Plumbing and sprinkler filed in conjunction with main application # b00809534
Bellevue hospital is fitting out an existing 9th floor lab as new it/mdf room. room will be protected with a dedicated single interlocked electronic actuated sprinkler system, with…
NEW POOL
Install nw pumpskid
Connect sanitary
Proposed mechanical work in conjunction to arch. designs. no change in use, egress and occupancy.
Installation of suspended scaffold for emergency facade repairs and facade inspection. suspended scaffold shall comply with chapter 33 of the 2022 nyc building code. no change in u…
8936 - Extending existing elevator shaft to accommodate larger cab. No change in egress use group or occupancy. Pro Cert Requested.
Plumbing work is proposed in existing unit #2 on the 2nd floor. Subsequent GC, MH, SP, and exterior applications will be filed. All per submitted plans. No changes to use, egress,…
Construction of 1 story new building for new pneumatic waste collection system for the polo grounds nycha campus in harlem. related applications to be filed as subsequent applicati…
Replace two exist windows, exist sealant at window perimeter. Repoint exist brick and cast stone joints. Clean exist brick efflorescence. Clean and coat exist cast stone. Repair ex…
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation of new storm piping, water/sanitary work subsequent filing to general construction (gc) filing.
Debris chute will be installed/built to lower debris from floor to floor. Mechanical means will assist with demolition from exterior and placed on grade.