Installation of mechancial system for entire building in conjunction with alt 1 application # m01151154. no change in use, egress or occupancy.
Remove interior existing non-load bearing partitions, doors, non-egress convenience stairs, cabinets, mill work, existing hvac equip with related duct as per plans. repair, patch,…
Ch/urban assembly - for temporary construction equipment (chute) submitting on behalf of contractor, related to dob# m01024451,m01149644, m01149657, m01149652 no change in use, occ…
Mechanical work to accommodate the new 22 story jail building.
modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Carroll mech
Demolish two existing electric, centrifugal chillers. provide new 6-pipe water-to-water heat pumps. replace 3 existing chilled water pumps. no change in use, egress or occupancy.
Structural work filed for ceiling repairs and boiler room ceiling support as per plans filed. no change in use, egress or occupancy.
Mechanical work filed in conjunction with renovation of 5-story building: provide new hvac units. no change to use, egress or occupancy.
Mechanical work filed in conjunction with renovation of 5-story building: provide new hvac units. no change to use, egress or occupancy.
Mechanical plans filed herewith in conjunction with dob now application b00976213.
New two-family dwelling
NYCHA BOILER-CARVER_BLDG #5_Remove and replace duplex vacuum condensate pump set. Provide 2-hr fire rated enclosure, flue gas breaching/flue system and combustion air intake breech…
NYCHA BOILER-CARVER_BLDG #5_Remove and replace duplex vacuum condensate pump set. Provide 2-hr fire rated enclosure, flue gas breaching/flue system and combustion air intake breech…
BLDG #13_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; louver, equip c…
BLDG #11_Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; new Mech Equipment Rm-2, equipment concrete pads, and…
BLDG #11_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; new Mech Equip…
BLDG #8_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; louver, equip co…
BLDG #10_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; new Mech Equip…
Mechanical specifications filed in conjunction with gc application b01239985-i1