17,354 permits matching "roofing"
Install suspended scaffolding, perform facade inspections and install roof hoist for exterior facade repairs. sidewalk shed filed under separate application.
ShopRite: Replacing refrigerated cases with new in same locations. Installing a new fluid cooler on the roof. Providing new water and waste to new fluid cooler.
Supplemental to 24010-20000-01298 for Deferred submittal for Roof ladder& glazing, All work per engineering
replacing of hung ceilings in portion of first floor and mech penthouse to accommodate new ductwork layout and new lights. Replacement of a portion of roof for installation of new ac condensers. Minor...
New detached wood frame garage. dimensions and setbacks per application. building outside dimensions: 20'-0' ' x20'-0' '. gable roof height to peak: 10'-0' '.
repair and replace existing ac dunnage on portion of roof. No change to use, egress or occupancy under this application
Install suspended scaffolding, perform facade inspections and install roof hoist for exterior facade repairs. sidewalk shed filed under separate application.
Infill of existing stair and elevator openings, framing for new slab infill, mechanical equipment support, new pergola, and reinforcement of roof slab.
Spr 2019 cbrc: exterior alterations to existing 2 story single family home w/basement . work to include front new porch, roof, window replacement and relocation and electrical as per plans. (occupancy...
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Installation of temporary roof protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of photovoltaic solar array on existing roof system as per plans.
Installation of solar system on the roof of garage as per plan. No change in use, egress or occupancy
Installation of solar panels on roof. no change in use, egress, or occupancy.
Self certification 2019 cbc. exterior remodel to an existing gas station mart. new brick veneer, new brick/ parapet walls and replacing roofing material to an existing gas station mart. all work as pe...
Self cert 2019cbc : erect 2 story va frame single family residence with basement, first fl rear covered deck and detached 2 car garage with roof deck and pergolas, existing occupancy r-5 , proposed oc...
Emergency Power was cut to an occupied resident because there was a non AE meter socket. Upgraded to a 200A AE bypass meter socket and in stalled riser through the roof
Herewith filing general construction work for the removal of interior finished ceiling, framing and existing roof hatch door, as per plans submitted. There is no change to use, egress or occupancy und...
Herewith filing structural work to create new opening for skylight, and framing work at the roof level, as per plans submitted. There is no change to use, egress or occupancy.
Remove gas generator. cap and remove existing gas line at basement facade and roof. no change in use, egress or occupancy.