Search Building Permits
2,809 permits · Commercial
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Please assign to hub cdu per consultation on 2/18/26. structural work for installation of temporary av screen and platforms for temporary performance venue.
Construction of New Commercial High Rise Building. NYC Development HUB Consultation on 8.11.2021. ENERGY MODELING SUBMITTED UNDER MECHANICAL SUBSEQUENT FILING M00615380-S5.
Erect steel pole on existing concrete footing for ground sign
D/sign vd-5
Direct/sign #vd4
Erect exterior aluminum backer panel cabinets above commercial storefront
D/sign vd-6
Install (1) illuminated wall sign @ 228" x 31" (49 sqft)
Erect steel pole on existing concrete footing for ground sign
Construction of New Commercial High Rise Building. NYC Development HUB Consultation on 8.11.2021. ENERGY MODELING SUBMITTED UNDER MECHANICAL SUBSEQUENT FILING M00615380-S5.
Eplan. Plan check for new single face monopole digital billboard (pole sign) on Metro property.This is sign "FF-1". Please note that the renderings show the location with the pole on the right side;
Installation of sign pole/ foundation.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Supplemental permit to 26048-10000-00185 to change contractor from metro signs inc (984884) to stellar installations inc (810013)
Erect exterior aluminum backer panel cabinets above commercial storefront
Foundation design
eplan Install One (1) NEW Hanging Channel Letter Wall Sign @ 8'-9" X 1'-6 3/8"
Erect an non-illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. no change in use, egress or occupancy.
Install (1) projecting sign "b" per plan