168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Full interior demolition of existing restaurant, including all walls, restrooms, ceiling and finishes, hvac, and plumbing. prep space for new bank tenant.
Total demo of sfr 1162 sqft circa 1981
Total demo of SFR 2917 sq ft circa 1947 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification r
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Demolition Application #Q01404220-I1
670 Jones ave Demo
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
City Funded Demolition 1. EMERGENCY CURB-SIDE DEMOLITION. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing. 2. Contract term 20 da…
Renovation of apartment w4de. demolition and modification of existing non-bearing partitions. no change in use, egress or occupancy.
Total demo of detached garage 200 sq ft circa 1948
Total demo of SFR 832 sq ft circa 1948 Total demo of detached garage 200 sq ft circa 1948 ***The building shall not be demolished until after the con
Total demo of SFR 1483 sq ft circa 1960 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification r
Minor interior demolition of non-load bearing partitions, construct interior non-load bearing partitions and finishes. No Change in use, egress or occupancy.
Proposed renovation and combination of existing residential apartments 14f and 14g as per tppn 03/97. work includes interior demolition of existing partitions and construction of n…
Total demo of SFR 1260 sq ft circa 1952 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification r
Total demo of sfr/deck/porch 1228 sqft circa 1949
Minor interior renovation of apartment # 98 on the 9th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use egress…
Filed for interior demolition of the second floor. no change in use or occupancy.
Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on the 51st floor as per plans. No change to use, egress or occupancy.
Interior demolition of non-bearing partitions, finishes and cabinetry in preparation for renovation of existing building. no change to use, egress or occupancy. alt-co filed under…
Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site.
Application filed herewith to propose partial demolition plans of 3 story building and attic