Search Building Permits
2,061 permits · Demolition · NY
Demolition of non-load bearing paritions, intallation of new partitions, doors and finishes on the first (1st) floor, apt. 1ds as per plans. no change to use, egress or occupancy.
Interior non-structural demolition as shown on the plans.
Full demolition of detached 2 story mixed use building to comply with NYC HPD Immediate Emergency Declaration, DEC# 19866
Interior 1st floor renovation with selective demolition, new non-load-bearing partitions, new door installation, ceiling adjustments, and finish work as per the architect's plans. there is no change t...
Interior demolition and alteration including installation of non-load-bearing partitions, ceiling and related finishes. No change to egress, use, or occupancy.
Sprinkler alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per plans.
Supersede expired approved full demo job# 321844830 , for full demolition of 2-story with basement residential house.
Demolition and renovation of second floor of existing building. new steel-framed second floor structure at 470 86th street.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 45th floor as per plans. No change to use, egress or occupancy.
Combination of tax lots & two existing single-family residential townhouses. Exterior masonry, enlarged window masonry openings, interior masonry demolition to connect the existing townhouses, interio...
Full demolition to a two story house
Preparation Work for Full Demolition - Removal of Glass Windows
Interior demolition as per plans filed herewith. No change to use, egress or occupancy.
installation of construction fence to protect site during full demolition
installation of construction fence to protect site during full demolition
Construction build out of existing restaurant on 1st floor which is a white box, renovation includes demolition of existing non loading bearing partitions. a new restroom to be added as are new non-lo...
Selective interior demolition and construction work on the 9th floor. No change in use, egress, or occupancy.
Interior demolition including removal of all non-structural interior partitions, furring and finishes.
Full demolition of existing 1-story temporary structure.
Filing herewith sprinkler demolition as per plans