168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary needle beam as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
MS Application for associated ducts, sound lining, and diffusers
Application filed to install kitchen exhaust systems (hood,ductwork, make-up fan and exhaust fans) and split ac for existing commercial space at first floor as per plans. fire supp…
Installation of new Mechanical system for ground level retail space. No change of use, egress or occupancy.
Hereby filing to demolish/remove existing mechanical units with associated ductwork and piping as shown on plans filed herewith. No change to use, occupancy or egress.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
New 2 story horizontal addition at side yard and 2nd floor vertical addition over existing 1 story at rear. gut interior, new partitions, doors, windows, kitchencabinets, trim, fin…
Modification of the mechanical system to install new ducts and associated piping as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Filing herewith drawings indicating modifications to mechanical systems on the 7th floor. No changes in use, egress, or occupancy.
Installation of new 4-ton system for commercial space. no change in egress or occupancy.
Remove (2) low pressure steam boilers & replace with (2) new low pressure hot water boilers. replace (2) new combination #2 oil/nat gas burners. replace associated pumps and piping…
Mechanical work as shown on plans
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Interior renovaiton existing commercial space with partition and mechanical work on 1st floor. no change in use, egress or occupancy.
Proposed replacing of indoor hvac heat pump equipment @apt. 7e . mechanical work as per plans. no change in use, egress or occupancy.
Mechanical work to accommodate new tenant at existing commercial space. New HVAC. No change to use egress or occupancy.
Cooling tower replacement as per plans. No change in use, egress, or occupancy.
Demolition to existing mechanical systems as per plans filed herewith. NO change in use, egress or occupancy.
Boiler replacement
Replace oil burner with gas/oil burner on exisitng boiler. change grade of fuel oil from #4 to #2.
Proposed horizontal and vertical enlargement to existing commercial space. New plumbing equipment and minor partition work. Change of Use at Cellar Level.