168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Spr 2019 cbrc: renovation of three bathrooms in elementary school building, one boys', one girls', and one single user gender neutral restroom. occupancy group e-1 construction typ…
2019 spr cbrc: facade repairs to existing 2 story building. (const type iiib, use f-2)
Tuckpointing and unit masonry repair / replacement: 500 sq. ft., lintel qty. 0, max. length 0. location: parapet wall and chimney.
Fire alarm: repair existing system. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: no. special locking: yes. monitoring type: sup…
Tuckpointing and unit masonry repair / replacement: 875 sq. ft., lintel qty. 0, max. length 0. location: exterior facade.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Spr 2019 cbrc - interior alteration to an existing family home including replacemnt of rear open stairs as per plans
Tuckpointing and unit masonry repair / replacement: 1750 sq. ft., lintel qty. 0, max. length 0. location: front facade.
Tuckpointing and unit masonry repair / replacement: 2000 sq. ft., lintel qty. 0, max. length 0. parapet rebuilding: 450 sq. ft. location: masonry repairs - south and east elevation…
Tuckpointing and unit masonry repair / replacement: 600 sq. ft., lintel qty. 0, max. length 0. location: north and west.
Self-cert 2019 cbrc: ***structural peer review*** first floor scope includes finishes and equipment modifications to the existing weight room (assembly) and renovation of the exist…
Spr 2019 cbrc: renovation of five bathrooms in elementary school building, two boys', two girls', and one single user gender neutral restroom. occupancy group e-1. construction typ…
Proposed partial 2nd floor addition, interior alterations, and removal of all ramps and accessable platforms for an existng 1 story sfr w/basment and attic, per plans. administrati…
Repair (26% to 50%) for wood porch (open) (quantity: 1, location: rear of building).
Self-cert 2016 cbrc: interior alteration
Tuckpointing and unit masonry repair / replacement: 3000 sq. ft., lintel qty. 0, max. length 0. location: all elevations.
Scope: nonstructural interior alteration in kitchen and bathroom on first floor. add new bathroom, new mechanical room and new utility room in the basement. locations: 1 residentia…
Fire alarm: repair existing system. affects: 0 dwelling units; 1 non-residential units. high-rise building: no. voice communication: yes. special locking: no. monitoring type: city…
Spr 2019 cbrc. minor interior renovation of a 2 story brick single family residence. extension of basement and adding a 1 story rear addition. all work as per plans.
Water damage repair/replacement on one(1) 6000lb capacity, 21-floor, 350fpm, passenger elevator(#31), pursuant to the scope of work on location at time of inspection.(ev006517)
Dds 2019 cbc: interior alterations to existing levels 14 and 15 of the galter pavilion to include conversion from business ambulatory care to an intensive care unit & a 2 story con…