5,335 permits · HVAC · NY
Mechanical modifications to ducts and piping as per plans filed herewith. No change to use, egress, or occupancy.
Replace eleven (11) gas/oil fired boilers with three (3) gas/oil fired boilers.
Installation of (2) 15 ton ac units and associated ductwork on 5th floor as per plans. no change in use, egress or occupancy.
Mechanical specifications filed in conjunction with gc application b00683623-i1
Modifications to the existing HVAC System: Relocate ductwork and linear diffusers on the 25-26 and 28th Floors as per plans (DLA Piper Renovations.) No change to use, egress or occupancy.
Modification to existing mechaical system, ductwork, and diffusers as shown on drawings no change to use, egress or occupancy.
Replacement stairs and doors of boiler plant and tank/pump rooms in kind with existing. replacement concrete equipment pads.
Removal of existing tank room mechanical, heating and domestic hot water system. installation of new hot water system and associated piping and ducts. no change in use egress or occupancy.
Proposed mechanical units and related duct work within building, all as per plan. No change to use, occupancy or egress.
Replace oil boiler and burner. installation of four (4) - 330 gal. fuel oil tanks and abandon in-place the existing 5,000 gal. fuel oil tank. no change in use, egress or occupancy.
Modification of existing mechanical systems to support the subdivision of a former single-tenant space into multiple tenant spaces. New HVAC units and ductwork are provided for common areas and lobby...
Subsequent filing for plumbing work. install bathroom, kitchen, and boiler room. no change in use, egress, or occupancy.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Replacement stairs and doors of boiler plant and tank/pump rooms in kind with existing. replacement concrete equipment pads.
Replace eleven (11) gas/oil fired boilers with three (3) gas/oil fired boilers.
Replacement of air conditioning unit for the lobby area. No change in use egress and occupancy.
As per dob inspector instructions, the subseq (-s1) is filed to remove administratively and put in void status the 5th tank (fs-00005925) that was approved under (-i1) but never installed/void during...
Mechanical modifications taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Mechanical modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Mechanical modifications taking place on the 32nd floor (33rd floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com