168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Exterior and interior work for occupancy change, including new masonry infill, service door,and exterior loading platform at rear, new recessed entrance doorway at front, interior…
Dry extended underground detention basin designed as mrc.
Commercial Make Safe Permit - For (repair of rear wall as per Engineer’s report) to resolve case CF-2025-126823. A separate permit is required for any additional alterations that a…
Commercial make safe permit - make safe permit to comply with cf-2026-011215 to include sistering of damaged floor joists as per approved plans and in accordance with code bulletin…
Commercial make safe permit - make safe permit to comply with case #cf-2025-088385- for the facade repair of an existing structure as per engineer's report and plan. abutting sidew…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Commercial Make Safe Permit - MAKE SAFE PERMIT- For the replacement of a 4'-0 long by 6'-0 high section of cmu non-load-bearing exterior wall with like-in-kind materials as per Eng…
Commercial make safe permit - make safe permit to resolve case violation #cf-2025-116191 to repair damage caused by fire as per the engineer's report and approved engineer plans. a…
Commercial make safe permit - for the replacement of the damaged exterior wall and lintel to resolve case cf-2025-031320. all work to be done per approved plans and engineering ins…
Commercial make safe permit - make safe permit to comply with unsafe violation cf-2025-121101 to include infill of party wall breaches per approved plans, engineers report and in a…
Commercial make safe permit - make safe permit to comply with case #cf-2026-008044- for the repair to an existing structure as per engineer's report. abutting sidewalk must be clos…
Certificate of occupancy (co) (may include lo) - for a certificate of occupancy on the ground floor for a child care center (group e) with 17 children on level of exit discharge in…
Certificate of occupancy (co) (may include lo) - for a certificate of occupancy for a personal services - body art service (group b) in a mixed-use commercial/residential building.…
Commercial make safe permit - in accordance with code bulletin pm-1801, a pa professional engineer is required to monitor repairs made under this permit. the engineer must submit a…
Commercial Make Safe Permit - For (removal and replacement stucco work as per Engineer’s report) to resolve case CF-2026-010077. Abutting sidewalk must be closed with fencing a min…
Commercial make safe permit - make safe permit to resolve case violation # cf-2025-133608 to repair damage to front wall caused by vehicle impact as per the engineer's report and a…
Commercial make safe permit - make safe permit to comply with unsafe violation cf-2025-089325 to include repairs to exterior stucco cladding per approved plans, engineers report an…
Certificate of occupancy (co) (may include lo) - for a certificate of occupancy for martial arts studio (personal services, group b) in an existing commercial building. no alterati…
Commercial make safe permit - in accordance with code bulletin pm-1801, a pa professional engineer is required to monitor repairs made under this permit. the engineer must submit a…
Commercial make safe permit - **make safe permit** for reconstruction of a side bay and repairs to a rear bay to comply with violation # cf-2024-002392. not to exceed scope of work…