168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
mayoral ed 13-01: demolish (e) 1 story restaurant/grocery type iiia building.
existing door located in the kitchen and in-fill and close out. demolish existing window at the dining room and relcoated a door to provide egress to that rear side yard.
replace 3 existing windows on the (back) north elevation. replace (1) door on the north (back) elevation. demolish (1) windows on the east (side) elevation.
Demo existing restaurant (3840 sf), retail (3840 sf) , and auto repair (1920 sf).
Demo existing auto repair and auto sales building.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Early Start Demolition on the 20th Level (17,300 SF). No Change of Use, Area, Occupancy, or Change to Exterior.
Demo existing sfd + 2 car garage (detached)
Eplan: tenant improvement to existing office building to create three new suites. suite 200 to be 6,347 sqft, suite 210 to be 3,604 sqft , and suite 220 to be 6,514 sqft. scope of…
Comply with department order effective date 11/22/2021. permit will expire 30 days from issuance dateeplan: demolition of rec room***see comments
Demo the (e) 7,040 sq. ft. one story auto repair.
Demo existing recording studio, pedestrian protection fence required
Eplan. demolish existing detached 1-car garage in conjunction with adu construction
Remove/Demolish portion of concrete masonry wall and replace with 5' vinyl fence to be part of pool enclosure
ePlan: Demolition of SFD and detached garage.
demolish 2nd fl rear exterior bay wall and reframe for new door system. new 53 sf deck. replace in kind 2 kitchen windows. replace in kind partio doors and downstairs rear bedroom…
27th floor: selective renovation and minor demolition. new construction includes floor, wall and ceiling finishes, power and lighting. fire sprinkler and alarm are deffered submitt…
Early start demolition of existing non-bearing partitions and finishes.
Demo the (e) sfd and detached garage
Demolish existing detached garage
Demo the (e) garage