168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
The scope of work of this project involve providing sprinkler heads for the conveyor along the wall and sprinkler heads below duct work two feet wide and larger with sprinkler head…
Installation of temporary needle beam as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Demoing existing ductwork in space 3009.
Install new chimney liner and extension as per plans. no change in use, occupancy, or egress.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
install condensing units at windows, air handlers, ductwork, no change to use, exits or occupancy
Filing Mechanical Equipment Use On Grade In Conjunction With Full Mechanical Demolition Phase job number M01340535-I1
Replace existing hvac units as per plans. no change in use, occupancy, or egress.
Removal of existing mechanical systems, grilles and diffusers in the pantry and 7th floor bathrooms. installation of new air-cooled split heat pump units for the pantry. installati…
mechaniacal work associated with the townhouse renovation as shown on plans filed herewith. no change to use, egress or occupancy
Mechanical equipment in conjunction with demolition of existing building
K005-install new structural steel framing to support new mechanical louver & new windows.
Interior renovation to convert this one-family building into a two-family building
Replacement of gas fired RTU with heat pump RTU and other mechanical work as per plans herewith. No change to use, egress, or occupancy.
Proposed heating, cooling and ventilation systems, HVAX air distribution and ductwork layouts as per plan filed in conjunction with Alt-CO-GC # M00975056-I1.
Installation of a new mechanical system
full demolition of 5 story structure, using hand held, and mechanical will assist on grade only.
Mechanical Work filed in conjunction with Alt-CO application
mechanical equipment to assist with demolition & chute will be built to lower debris
install an emergency generator in conjunction with Alt-CO X00871166-I1