168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of heavy-duty sidewalk shed for new building as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of t…
Construction fence - applicable to new building application and demo application
Filing tenant (bread ahead) architectural fitout of existing basement restaurant as per plans. new awning installation. exterior signage and meps filed separately. no change to use…
Interior renovation of Apt 8A on the 8th floor. New flooring, cabinets, replace and relocate partitions, painting. No change in use, egress or occupancy.
Interior renovation of existing two family house. obtain new c of o
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Proposed plumbing work in conjunction with nb application # x01266815-i1
Equipment use: single 6000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app…
exterior renovation of exist. two family building work on OSP with install new awning , no change in use, egress or occupancy.
Replace facade finishes and fence. New canopy. No change to use, egress or occupancy.
New temporary 8'-0 wood construction fence
Remove Illegal New CMU wall part of the building at rear and restore as prior Condition and Lift partial Stop work order. No change use egress and occupancy
Propose installation of plumbing fixture, storm drainage system, water service system as per plan, filed in conjunction with Alt-CO-NB # B01218894-I1.
Remove/Discard: Existing Light Fixtures/Steel hatches/VCT Flooring/Ceramic Wall Tile/Shower Pan/Stone Wall/Existing Door/Frame/Paint and associated hardware. Install new door/wood…
Install new dry temporary standpipe during construction as per plans filed. Filed in conjunction with NB # 121207504.
Feldman: Modifications to install new light post supports as per plans.
Application filed for interior and exterior renovation of existing commercial building. New facade, elevators, partitions and finishes. Amend description of uses, occupancy group a…
Herewith filing structural plans of 2-storey new building. the proposed work includes concrete metal deck slab over steel framing bearing on cmu walls with cmu as lateral resisting…
Convert existing building from 3 to 1 family, interior and exterior alterations. construct new 1-story rear horizontal enlargement. demo and construct interior partitions, cabinetr…
Interior renov. of an exist. 2-stry. w/bas.&cell., 1-fam. d.u. bldg. as shown on plans. work consist of new partition & doors. install a metal deck at the rear. no change in bulk.…
Install plumbing work as per plans filed, in conjunction with nb #x01031302-i1