Search Building Permits
5,430 permits · Roofing · NY
Plumbing Work for Roof
Interior renovation of 1 family brownstone at basement, 001, 002 and roof. minor structural work as per plans. no change in use, bulk, occupancy or egress.
Rebuild the water tank bulkhead with stairway on roof. no change of use, egress or occupancy.
exterior facade repairs, concrete patching, stucco repairs, pointing waterproofing.
Cooling & heating spaces w/wall mounted, ductable split units & provide new air terminals. Install Heat Pumps, VRF units, refrigerant piping, ductwork, supply/return registers, bath/shower fans, goose...
Existing garage: Repair deteriorated walls and roof to restored to existing conditions. And resolve DOB Violation and remove Partial Stop Work Order And DOB violation
Existing garage to repair deteriorated walls and roof to restore to existing conditions,
Triplex. combination of apartments 2ab/3b as per tppn #3/97, new convenience stair connecting 1st & 2nd floors & smoke-proof partition, new convenience stair connecting 3rd & 2nd floor, new window. no...
Remove and replace existing roof drains and partial associated storm piping.
Removal and replacement of roof membrane systems of all roofs as shown on drawings. no change in use, egress or occupancy.
installation of solar panels, rooftop, railed, grid-tied, 11 modules, 4.785 kw
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of temporary roof protection as per drawings, roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Replace existing rooftop mechanical equipment. replace existing interior air handlers and humidifiers, and assoicated piping. no change to use, egress or occupancy.
New foundation work for renovation of existing home including sistering and reinforcement of existing floor/roof joists throughout, reframing of existing horizontal enlargement and new dunnage for new...
Installation of solar pv system on exisiting rooftop. no changes to the egress, use or occupancy
Installation of 300psf sidewalk shed, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this a...
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Installation of 300psf sidewalk shed, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this a...
Facade and roof restoration as indicated on plans filed herewith. no change in use, egress or occupancy.