Building Permits in ZIP 10002
Manhattan, NY — 525 permits filed recently
525 permits
Pipe Scaffold Installation
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Chute Installation
Temporary Fence Installation
Temporary Fence Installation
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Chute Installation
Pipe Scaffold Installation
Interior fitout of store space on the basement floor. Installation of new non-bearing walls. No change to egress, use, or occupancy.
Installation of non-emergency gas fired generator with related gas booster pump on new steel dunnage platform on roof. No change to occupancy, use, or egress.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Filing herewith Alteration Type one to change the use on the 2nd floor as per plans.
Filing herewith for installation of grease exhaust duct ( 12 ga black iron ), grease exhaust hood type - i, and makeup air supply system for first floor kitchen: relocate nfpa-96 compliant grease exha...
Interior fitout of store space on the basement floor. Installation of new non-bearing walls. No change to egress, use, or occupancy.
Filing herewith for installation of grease exhaust duct ( 12 ga black iron ), grease exhaust hood type - i, and makeup air supply system for first floor kitchen: relocate nfpa-96 compliant grease exha...
Installation of non-emergency gas fired generator with related gas booster pump on new steel dunnage platform on roof. No change to occupancy, use, or egress.
Filing herewith Alteration Type one to change the use on the 2nd floor as per plans.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Filing herewith renovation of existing offices as per plans. no change in use, egress or occupancy.
Filing Plumbing work to for a new natural gas service to transition boiler plant from fuel oil to dual-fuel.