Building Permits in ZIP 10016
Manhattan, NY — 1,066 permits filed recently
1,066 permits
At first floor, modification to egress and egress door/facade assembly. no change in use or occupancy,
Erect interior non-load bearing partitions with finishes as per plan. There is no change to use, egress or occupancy. Associated applications ALT 1 # 110366443, (MS) M01330947, (PL) M01330949, (SP) M0...
Filing for removal of related bulkheads and associated work throughout the building as per plans filed herewith. No change in use, egress or occupancy in this application.
Herewith filing for facade repairs as per plans. No change in use, occupancy, or egress.
Mechanical work to lobby as per plans filed herewith. no change to use, egress or occupancy.
on 15th fl, remove non bearing partitions and finishes. No change in use, egress or occupancy
Overhead protection as per drawings. overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Modification of existing duct ventilation system only for existing hvac units installed on site and new toilet exhaust fans as per plan. no change to use, egress or occupancy.
Minimal patch and repair on walls and the change of use from showrooms to offices as per plans filed herewith.
Installation of temporary construction fence as per drawings. fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application
Application filed for sprinkler additions/modifications on the 10th floor (suite 1002) as per plans filed herewith. no change in use, egress, or occupancy.
Modification of existing duct ventilation system only for existing hvac units installed on site and new toilet exhaust fans as per plan. no change to use, egress or occupancy.
Application filed for sprinkler additions/modifications on the 10th floor (suite 1002) as per plans filed herewith. no change in use, egress, or occupancy.
Herewith filing for facade repairs as per plans. No change in use, occupancy, or egress.
Filing for removal of related bulkheads and associated work throughout the building as per plans filed herewith. No change in use, egress or occupancy in this application.
At 9thfloor south and and 10thfloor entire tenant space, modifications to existing sprinkler and standpipe system as per plans filed herewith. no change to occupancy or means of egress.
Minimal patch and repair on walls and the change of use from showrooms to offices as per plans filed herewith.
Mechanical work to lobby as per plans filed herewith. no change to use, egress or occupancy.
At first floor, modification to egress and egress door/facade assembly. no change in use or occupancy,
on 15th fl, remove non bearing partitions and finishes. No change in use, egress or occupancy