Building Permits in ZIP 10016
Manhattan, NY — 1,066 permits filed recently
1,066 permits
Overhead protection as per drawings. overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Erect interior non-load bearing partitions with finishes as per plan. There is no change to use, egress or occupancy. Associated applications ALT 1 # 110366443, (MS) M01330947, (PL) M01330949, (SP) M0...
Installation of scaffold as per drawings. scaffold shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Installation of temporary construction fence as per drawings. fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application
Install new gas piping from existing gas meter and service to replacement gas/oil burner.
Provide A new wet, automatic fire sprinkler system sourced from a new combined domestic/fire water service with a new sprinkler booster pump.
Propose new domestic water service, booster pump and well tank; hot water via boiler and indirect water heater; sanitary and storm system; new gas line for boiler and gas appliances as per plan, in co...
Replace oil burner with gas/oil burner on existing boiler
Provide A new wet, automatic fire sprinkler system sourced from a new combined domestic/fire water service with a new sprinkler booster pump.
Propose new domestic water service, booster pump and well tank; hot water via boiler and indirect water heater; sanitary and storm system; new gas line for boiler and gas appliances as per plan, in co...
Install new gas piping from existing gas meter and service to replacement gas/oil burner.
Replace oil burner with gas/oil burner on existing boiler
Plumbing work in conjunction with apartment renovation, GC filed in separate application. No change in use, egress or occupancy is involved.
Replace boiler.
At 1st floor tenant space, additions/modifications to plumbing system including new fixtures and related piping as per plans filed herewith. no change in use, occupancy or means of egress.
Plumbing work in conjunction with apartment renovation, GC filed in separate application. No change in use, egress or occupancy is involved.
At 1st floor tenant space, additions/modifications to plumbing system including new fixtures and related piping as per plans filed herewith. no change in use, occupancy or means of egress.
Replace boiler.
Proposed interior renovation works on the 9th floor as per plan. no change in use, egress, and occupancy.
New plumbing fixture per plan for existing commercial space. No change in use, occupancy or egress.