Building Permits in ZIP 10020
Manhattan, NY — 166 permits filed recently
166 permits
Demolition and general construction work on 16th floor as per plans. No change to use. egress or occupancy.
Temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Demolition and general construction work on 16th floor as per plans. No change to use. egress or occupancy.
Temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Alterations to plumbing system on 16th floor as per plans. No change to use, egress or occupancy.
Temporary roof protection as per drawings. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of temp Frame Arches.no alt to exist structures for VCA Blooms 2025. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment re...
Installation of temp Frame Arches.no alt to exist structures for VCA Blooms 2025. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment re...
Alterations to plumbing system on 16th floor as per plans. No change to use, egress or occupancy.
Temporary roof protection as per drawings. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Alterations to sprinkler system in existing skate hut in basement as per plans. No change to use, egress or occupancy.
Alterations to mechanical system on 1st and 2nd floor as plans. No change to use, egress or occupancy.
Demolition and general construction on retail on 1st and 2nd floors as per plans. No change to use, egress or occupancy.
Demolition and general construction on retail on 1st and 2nd floors as per plans. No change to use, egress or occupancy.
Alterations to mechanical system on 1st and 2nd floor as plans. No change to use, egress or occupancy.
Demolition and general construction work on partial 25th floor as per plans. No change to use. egress or occupancy.
Alterations to sprinkler system in existing skate hut in basement as per plans. No change to use, egress or occupancy.
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
Mechanical changes as indicated on plans.