Interior renovation of phd as indicated on plans filed in conjunction with dob now pl. no change to use, occupancy or egress.
Removal of existing sprinkler heads (wet) and piping and installation of temporary core sprinkler protection (TCSP) as per plans filed herewith. No change in use, egress or occupancy under this applic...
Plumbing modifications as related to interior renovation. no changes to use, occupancy or egress. scopeincludes removal of existing plumbing fixtures, and installation of new appliances and plumbingfi...
Structural reinforcement on the 46th Floor, as per plans. No change to use, egress, or occupancy.
General construction for tenant Common Fund on 22nd marketing floor (21st construction)
FILING FOR DEMOLITION OF METAL STAIR FROM 35th TO 39th FLOOR, INFILL OF EXISTING SLAB OPENING ON 36th THROUGH 39th FLOORS WITH NEW SLAB CONSTRUCTION AS PER PLANS SUBMITTED HEREWITH.
Sprinkler/standpipe systems in conjunction with Alt-CO as shown on plans.
Plumbing work in conjunction with Alt-CO as shown on plans.
Filed herewith for plumbing work as per plans.
Replacement of cooling tower on the roof. no change to egress, use, or occupancy.
Proposed non-structural interior modification including modification at the kitchen and bathroom along with interior finish modifications throughout. no change in use, egress, or occupancy is proposed...
Proposed plumbing work to replace gas stove on existing piping, and to replace sink and dishwasher on existing roughing. no change in use, egress or occupancy.
Modifications to the existing sprinkler system on the 45th Floor, as per plans. No change to use, egress, or occupancy.
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 47th Floor, as per plans. No change to use, egress, or occupanc...
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 45th Floor, as per plans. No change to use, egress, or occupanc...
Modifications of the existing HVAC system and associated ducts & piping on the 47th Floor, as per plans. No change to use, egress, or occupancy.
Modifications of the existing HVAC system and associated ducts & piping on the 45th Floor, as per plans. No change to use, egress, or occupancy.
Modifications of the existing HVAC system and associated ducts & piping on the 46th Floor, as per plans. No change to use, egress, or occupancy.
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 46th Floor, as per plans. No change to use, egress, or occupanc...
Installation of mechanical systems in conjunction with Alt-CO as shown on plans.