Building Permits in ZIP 10022
Manhattan, NY — 1,619 permits filed recently
1,619 permits
Interior alteration to existing apt. 6b on the 6th floor. general construction work, demolish and construct non-structural interior partitions, doors, finishes. renovate ex. bathrooms and kitchen. no...
Modification to existing plumbing system as per plans filed herewith.
Proposed plumbing work to replace gas stove on existing piping, and to replace sink and dishwasher on existing roughing. no change in use, egress or occupancy.
Plumbing work in conjunction with Alt-CO as shown on plans.
Removal of existing sprinkler heads (wet) and piping and installation of temporary core sprinkler protection (TCSP) as per plans filed herewith. No change in use, egress or occupancy under this applic...
Sprinkler/standpipe systems in conjunction with Alt-CO as shown on plans.
Mechanical work for Common Fund on 22nd marketing floor (21st construction)
Installation of mechanical systems in conjunction with Alt-CO as shown on plans.
Interior renovation of phd as indicated on plans filed in conjunction with dob now pl. no change to use, occupancy or egress.
Replacement of cooling tower on the roof. no change to egress, use, or occupancy.
Plumbing modifications as related to interior renovation. no changes to use, occupancy or egress. scopeincludes removal of existing plumbing fixtures, and installation of new appliances and plumbingfi...
General construction for tenant Common Fund on 22nd marketing floor (21st construction)
Modifications to the existing standpipe system on the 45th Floor, as per plans. No change to use, egress, or occupancy.
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 47th Floor, as per plans. No change to use, egress, or occupanc...
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 46th Floor, as per plans. No change to use, egress, or occupanc...
Modifications of the existing HVAC system and associated ducts & piping on the 46th Floor, as per plans. No change to use, egress, or occupancy.
Removal of the existing slab & existing steel beams for new stair opening, new steel beams for stair structure & framing of the new stair opening, new steel for the support of a new sculpture as shown...
Modifications to the existing sprinkler system on the 45th Floor, as per plans. No change to use, egress, or occupancy.
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 45th Floor, as per plans. No change to use, egress, or occupanc...
Modifications of the existing HVAC system and associated ducts & piping on the 47th Floor, as per plans. No change to use, egress, or occupancy.