Building Permits in ZIP 10031
Manhattan, NY — 329 permits filed recently
329 permits
Rehab/ reconstruct (6) apt interiors #7-27-37-47-57-67 (after water + smoke remediation ) plus corridor work, interior finishes , non load bearing partitions , kitchen and bathrooms. Respond to Violat...
Rehab/ reconstruct (6) apt interiors #7-27-37-47-57-67 (after water + smoke remediation ) plus corridor work, interior finishes , non load bearing partitions , kitchen and bathrooms. Respond to Violat...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
DASNY sprinkler work for elevator upgrade project at City University of New York's North Academic Center.
DASNY sprinkler work for elevator upgrade project at City University of New York's North Academic Center.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation of suspended scaffold for facade work or inspection.
Installation of suspended scaffold for facade work or inspection.
Installation of suspended scaffold for facade work or inspection.
Installation of suspended scaffold for facade work or inspection.
Installation of sidewalk shed for pedestrian safety during construction. sidewalk shed shall comply with nycc 2014 chapter 33 . no change in egress, use, or occupancy.
Removal of existing 275gal fuel oil tank, installation of a new 275gal fuel oil tank connected to existing emergency generator at shepard hall, and installation of 275gal temporary tank for existing g...
It is proposed to install mechanical equipment and associated ductwork as shown on plans. application filed in conjunction w/ m01252354-i1 (gc) m01252354-s1 (st) and m01252354-s6 (plsp). no change of...
File suspended scaffold outrigger systems for facade restoration and inspection.
Propose rear enlargement (approx. 800 SF) to existing building. Interior renovation under separate Alt-2 application (Job# M01228024-l1). No overlap in scope.
Installation of sidewalk shed for pedestrian safety during construction. sidewalk shed shall comply with nycc 2014 chapter 33 . no change in egress, use, or occupancy.