Reach 7- proposed flood barrier sys. includes i-walls w/ cap/wall, micropile-founded t-/l-walls, closure gates (roller @ 2nd pl, swing @ 3rd, flip-up @ sea), slide-up gates, gravity wall & stair to so...
Reach 7 - Temporary relocation of the HVAC system. Once construction of the proposed area is done, HVAC will be restored back to its original location. No change to use, egress or occupancy.
Reach 7-new flood wall constr. for nwbpcr proj. scope involves excavation, grading, landscaping soil improvement. adding & compacting fill to stabilize site w/ erosion cont. stabilizing foundation of...
Filing SOE work for Reach 7 - Filing for the construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project including support of excavation for the proposed constr...
Reach 7-new flood wall constr. for nwbpcr proj. scope involves excavation, grading, landscaping soil improvement. adding & compacting fill to stabilize site w/ erosion cont. stabilizing foundation of...
Reach 7 - Temporary relocation of the HVAC system. Once construction of the proposed area is done, HVAC will be restored back to its original location. No change to use, egress or occupancy.
Reach 7- proposed flood barrier sys. includes i-walls w/ cap/wall, micropile-founded t-/l-walls, closure gates (roller @ 2nd pl, swing @ 3rd, flip-up @ sea), slide-up gates, gravity wall & stair to so...
Filing SOE work for Reach 7 - Filing for the construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project including support of excavation for the proposed constr...
Hereby filing for the renovation of unit 3g (installation of plumbing fixtures). no change in use, egress or occupancy.
Hereby filing for the renovation of unit 3g (installation of plumbing fixtures). no change in use, egress or occupancy.
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Darius Janczak
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Darius Janczak
Patch as requried existing partitions and grouted fire-stopping at concrete slab as requirired for plumbing work noted under dob application m01325570-i1. no change of use, occupancy or egress propose...
Patch as requried existing partitions and grouted fire-stopping at concrete slab as requirired for plumbing work noted under dob application m01325570-i1. no change of use, occupancy or egress propose...
Repair / replacement of existing house trap for existing tub installation. this work is being filing in conjunction with dob now application no. m01357524-i1. no change in use, occupancy or egress pro...
Repair / replacement of existing house trap for existing tub installation. this work is being filing in conjunction with dob now application no. m01357524-i1. no change in use, occupancy or egress pro...
Installation of gas piping from cellar to floors 1-9 to bulkhead on the roof.
Installation of gas piping from cellar to floors 1-9 to bulkhead on the roof.
Installation of temporary construction fence system as per drawings. fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application