Building Permits in ZIP 10301
Staten Island, NY — 99 permits filed recently
99 permits
exterior facade repairs, concrete patching, stucco repairs, pointing waterproofing.
Installation of new plumbing fixtures and piping on all floors including new and replacement of hot water heaters and gas hot water heater.
Structural work being filed for the rehabilitation of the existing steel and concrete structure. No change to use, egress, or occupancy.
Install new chimney liner as per plans. no change in use, occupancy or egress
installation of temp construction fence
Heavy duty sidewalk shed during exterior facade repairs filed separately under application# s01056063. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under...
No change in use, egress, occupancy and bulk.1) legalize plumbing fixtures on cellar floor and cap and remove plumbing fixtures at attic floor
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of temporary construction shoring for excavation as indicated on plans.there will be no change in the use, egress, or occupancy under this application.
Proposed temporary construction fence located inside of the property line for the construction of a new detached two family residence.
Installation of temporary construction fence for ps 80r at 715 ocean terrace, staten island as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of approximately +/- 389 lf of temporary sidewalk shed, as per plans, for public protection. no change in use, egress and occupancy.
Installation of construction fence as per plans filed. No change in use, egress, or occupancy.
Replaced exterior wall effected by car accident
Interior alteration & renovation of existing three-story residences.
Install wood deck, fence on rear yard of 2 story existing building. construction and concrete works as per plan. no change in egress, use, or occupancy.
Application is filed to correct ECB Violations 39140571L, 39140570J, 39140567Z, 39140566R.
Exterior Storm Piping