Building Permits in ZIP 10451
Bronx, NY — 236 permits filed recently
236 permits
Soe filing in conjuction with nb application hereby submitted to construct 13-story mixed-use new building with inclusionary housing as per filed plans.
Installation of new fuel cell generating system with auxiliary equipment. New mechanical exhaust system. Related Alt I #220742926 approved by DOB accordingly.
Soe filing in conjuction with nb application hereby submitted to construct 13-story mixed-use new building with inclusionary housing as per filed plans.
Installation of new fuel cell generating system with auxiliary equipment. New mechanical exhaust system. Related Alt I #220742926 approved by DOB accordingly.
Existing 3-story frame building with cellar, conversion of five-family dwelling to original three-family dwelling. no change in bulk, no change in egress.
Filing for repairs at this existing garage. No change to use, occupancy or egress.
Related plumbing work for new fuel cell generating system at 1st floor. Related Alt I #220742926 approved by DOB accordingly.
Existing 3-story frame building with cellar, conversion of five-family dwelling to original three-family dwelling. no change in bulk, no change in egress.
Filing for repairs at this existing garage. No change to use, occupancy or egress.
Related plumbing work for new fuel cell generating system at 1st floor. Related Alt I #220742926 approved by DOB accordingly.
Installation of temporary construction fence as per plan. no change in use, egress, or occupancy. the plywood fence attached to the outer sidewalk shed bridge will be solid plywood and wire mesh.
Installation of temporary construction fence as per plan. no change in use, egress, or occupancy. the plywood fence attached to the outer sidewalk shed bridge will be solid plywood and wire mesh.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the nyc building code.live load 300psf.
filing for interior renovation as per plans. No change to use, egress or occupancy.
Installation of new Daikin split system, air handlers and condensing units with related refrigerant piping as per plans filed herewith.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the nyc building code.live load 300psf.
Installation of new Daikin split system, air handlers and condensing units with related refrigerant piping as per plans filed herewith.
filing for interior renovation as per plans. No change to use, egress or occupancy.
Installation of the temporary fence at 379 east 158 street, bronx, ny 10451 as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of the temporary fence at 377 east 158 street, bronx, ny 10451 as indicated on plans. there will be no change in the use, egress, or occupancy under this application.