Building Permits in ZIP 11211
Brooklyn, NY — 835 permits filed recently
835 permits
Installation of plumbing fixtures on 1st floor: 6 cooking equipment, 1 shut-off valve, 11 sanitary/water plumbing fixtures. No change in egress, occupancy, or use under this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filling for application to remove paver from Unit 4A
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of plumbing fixtures on 1st floor: 6 cooking equipment, 1 shut-off valve, 11 sanitary/water plumbing fixtures. No change in egress, occupancy, or use under this application.
Filing to renovate existing commercial space, erection of interior non-load bearing partitions, flooring, finishes and ceiling work proposed. no change to use, egress or occupancy. filed in conjunctio...
Proposed conversion from two to one family of an existing two story dwelling.
Horizontal enlargment with interoir renovataion to an existing three stroy mix use builing
Interior renovation as shown on plans filed herewith.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Building 9- Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to...
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary pipe scaffold as per plans. pipe scaffold shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Interior renovation as shown on plans filed herewith.
Building 9- Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to...
Installation of temporary pipe scaffold as per plans. pipe scaffold shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.