Building Permits in ZIP 11211
Brooklyn, NY — 835 permits filed recently
835 permits
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary pipe scaffold as per plans. pipe scaffold shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Interior renovation as shown on plans filed herewith.
Building 9- Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to...
Structural application filed to rebuild the exposure 3 exterior wall with cmu. no change in egress, use or occupancy under this application.
Proposed to convert portion of existing manufacturing building to eating and drinking. No change in use, egress and occupancy.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed to convert portion of existing manufacturing building to eating and drinking. No change in use, egress and occupancy.
Structural application filed to rebuild the exposure 3 exterior wall with cmu. no change in egress, use or occupancy under this application.
Proposed installation 1 non-illuminated accessory business awning. no change in use, egress or occupancy.
Filing for repairs to the facades. No change to use, occupancy or egress.
Subsequent soe application filed herewith.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing work including domestic, sanitary & gas service for new 5-story & cellar residential building
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing for repairs to the facades. No change to use, occupancy or egress.
Subsequent soe application filed herewith.
Proposed installation 1 non-illuminated accessory business awning. no change in use, egress or occupancy.