Building Permits in ZIP 11215
Brooklyn, NY — 980 permits filed recently
980 permits
Subsequent application for plumbing fixture modifications as indicated.
Installation of new ductwork for the kitchen and bathroom exhaust at apartment #4j of an existing 4-story building as per plans filed herewith. no change in use, egress, or certificate of occupancy.
Mechanical work in conjunction with NB B00611202-I1 (Building B). Affordable housing. HUB consultation accepted on 9/21/21 (300 Nevins St).
Proposed interior renovation to cellar and first floor to convert existing store space into restaurant; exterior renovation to 1st floor storefront facade and side entrance. demolition work as shown o...
Filing for plumbing work in the cellar for laundry room update as per plans submitted herewith.
Plumbing fixtures in existing 3 story building filed in conjunction with dob now gc and st. no change to use, occupancy or egress.
HEREBY FILING FOR THE REMOVAL AND INSTALLATION OF SPRINKLER HEADS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. (Tenant building out - 449 5th Ave - In Conjunction with ALT-CO B00668652-I1)
Proposed plumbing
Plumbing work related to the interior renovation of existing 3 story 2-family home. no change to use, occupancy oregress.
Installation of plywood construction fence as per plans filed herewith
HEREBY FILING FOR THE REMOVAL AND INSTALLATION OF SPRINKLER HEADS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. (Tenant building out - 449 5th Ave - In Conjunction with ALT-CO B00668652-I1)
Mechanical work in conjunction with NB B00611202-I1 (Building B). Affordable housing. HUB consultation accepted on 9/21/21 (300 Nevins St).
Proposed plumbing
Plumbing fixtures in existing 3 story building filed in conjunction with dob now gc and st. no change to use, occupancy or egress.
Proposed interior renovation to cellar and first floor to convert existing store space into restaurant; exterior renovation to 1st floor storefront facade and side entrance. demolition work as shown o...
Filing for plumbing work in the cellar for laundry room update as per plans submitted herewith.
Installation of new ductwork for the kitchen and bathroom exhaust at apartment #4j of an existing 4-story building as per plans filed herewith. no change in use, egress, or certificate of occupancy.
INSTALL NEW AC SPLIT SYSTEM AT APTS # 3a & 3b AT THE THRID FLOOR.
Mechanical work filed in conjunction with renovation to ex. apt# phe. install split hvac system. install kitchen and toilet exhaust fans. remove 1 existing rooftop mechanical unit, install 2 rooftop c...
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...