Building Permits in ZIP 11231
Brooklyn, NY — 591 permits filed recently
591 permits
sprinkler in conjnction with alt 1 B01262011-I1
Installation of sub-slab depressurization system. No change in use, egress, or occupancy.
Combo of 4 apts. in existing 3-story building. the combination will convert the bldg from a r-2 to a r-3 occupancy group. horizontal englargement to extend building footprint in rear. interior alterat...
Interior renovation and conversion of existing 4-Family dwelling, to a 2-Family dwelling
Replace existing bathroom tub with shower as indicated on plans. Install new dishwasher and clothes washer.
replacement of existing rooftop HVAC and split system air ac units and all new controls.
Replacement of fixtures in existing bathrooms, new dishwasher.
Installation of temporary engineered enclosure system as per plans. no change in use, egress or occupancy.
Installation of temporary pipe scaffold & system scaffold as per plans. no change in use, egress or occupancy.
Filing five (5) story residential building with 3 dwelling units
PROPOSED PLUMBING WORK FOR A SINGLE FAMILY BUILDING. WORK AT OPEN SPACE, CELLAR, BASEMENT, 1st TO 4th FLOOR, AND ROOF. AS PER PLAN. IN CONJUNCTION WITH DOB NOW JOB#: B01278030-I1.
This Alteration is being filed for the interior demo work only. There are no change in use, egress or occupancy.
Installation of temporary pipe scaffold & system scaffold as per plans. no change in use, egress or occupancy.
Filing five (5) story residential building with 3 dwelling units
PROPOSED PLUMBING WORK FOR A SINGLE FAMILY BUILDING. WORK AT OPEN SPACE, CELLAR, BASEMENT, 1st TO 4th FLOOR, AND ROOF. AS PER PLAN. IN CONJUNCTION WITH DOB NOW JOB#: B01278030-I1.
Replacement of fixtures in existing bathrooms, new dishwasher.
This Alteration is being filed for the interior demo work only. There are no change in use, egress or occupancy.
Installation of temporary engineered enclosure system as per plans. no change in use, egress or occupancy.
Interior renovation within tenant space at Suite 213, new non-loadbearing partitions, paint, and flooring. New plumbing fixtures filed under subsequent plumbing application. No change of use, egress,...
Remove all existing trees and existing improvements (e.g. pavement, fencing, etc.) as indicated on drawings. install soil erosion and sediment control measures.