Building Permits in ZIP 60612
Chicago, IL — 98 permits filed recently
98 permits
Approval of new plan for stormwater management. project type: industrial. project area: 3.8 acres. this approval does not authorize any construction work. construction work may require separate permit...
Repair/replacement affecting 1 systems : 2 rooftop packaged unit(mammoth energypack-a-1-80e-ww-2ig1000-ct2008-x-p) . electrical work under this permit = no . locations: 0 residential unit(s), 1 non-re...
Scope: roof replacement. area: 1300 sq. ft. roof covering: built-up roof. location: the roof. il roofing contractor license: 104018261.
Permit expires on 06/08/2026 erection starts: 4/1/2026, erection ends: 9/28/2026. united centertent- reinstate permit 101077545, self-cert, 180 day event (4/1/2026-9/28/2026) erect one (1) 16.4x50 (5m...
Ada bathroom modifications. remove tub and install shower with associated fixtures and tile work.
Spr 2019 cbrc - renovation to existing 2-unit, two-story, residential coach house. project calls for new layouts for both units, masonry repairs to existing brick walls, construction of a new roof, an...
Line voltage electrical work. add 1 circuits to existing 200 amp service disconnecting means. receptacle outlets: 2 . lighting outlets: 1. specific location: basement.
Spr 2019 cbrc - renovation to existing 2 flat (front building) work calls for interior renovations including new layouts for each unit duplexing of the first floor unit into the basement; new plumbing...
Low voltage/communication electrical work. install data/video. specific location: suite 107.
Sc 2019 cbc; existing 3 story masonry 6 du apartment building. convert 3rd floor top two (2) units into one(1) unit, de-convertiing from 6 du to 5 du. interior renovations with all new drywall, carpen...
Line voltage electrical work. add 1 circuits to existing 200 amp service disconnecting means. receptacle outlets: 1 . lighting outlets: 0. electric vehicle supply equipment:1 spaces. specific location...
Renovation to existing linear accelerator vault to prepare for a new varian linear accelerator. connect to existing dual detection preaction fire sprinklers system. replace existing transtector power...
Dds 2019 cbc: full building permit for 4 story 18 d.u. building with basement, 10 car garage at basement, deck at 1st story over portion of garage, balcony at 2nd/3rd/4th story, rooftop deck, pergola,...
Decommission of two(2) 5000lb capacity, hydraulic platform dock lifts, pursuant to the scope of work submitted.(100359267)
Electrical maintenance permit. occupancy: business. start date: 4/1/2026. end date: 5/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electri...
Electrical maintenance permit. occupancy: business. start date: 4/1/2026. end date: 5/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electri...
Line voltage electrical work. new permanent 200 amp service disconnecting means with 40 circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: electrical service common area install...
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. 13.5 kwh lithium ion energy storage system. specific location: rooftop.
Scope: roof replacement. area: 127500 sq. ft. roof covering: other. location: roof top. il roofing contractor license: 104000268.
For permit 101072690: replacement general contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.