Building Permits in ZIP 94103
San Francisco, CA — 230 permits filed recently
230 permits
recommencement and completion of work approved under pa#201910225163 &201808076634
voluntary foundation upgrade to the basement. new foundation will be poured under (e) posts. the (e) posts and beams will be strengthened with sistered members.
1/fl- ab17- soft demo scope for 1st floor demo only no proposed construction improvements. no demo to ceiling components until associated sprinkler permit is issued
recommencement and completion of work approved under pa #2022-0331-1273.
updated evacuation plans on floors 5,6,7.
rebuild concrete wall at rear of the building. reference pa # 2026-0126-4518 associated with the demolition of the property line wall.
minor non-structural, interior alteration of (e) building and change of planning use from light manufactoring to lab engineering.
solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | (1) tesla powerwall 3 [1707000-xx-y]...
remove (e) analog addressable data card & replace with (n) addressable slc card. remove (e) field initiating devices with (n). install (n) control/synchronize module, 3 (n) high powered relay modules...
5th fl: new gym space in (e) office. (n) showers, tub, sauna room, locker rooms.
40 fl : revision to pa # 202405162245: changing locations of posts from the center stairway.
partial foundation replacement.
revision to pa #202510207737 for new egress door and stair from loading dock.
demo and dispose existing old pole lights & wirings. install new ballard lights inside lawn area near existing. install new ballard lights in other areas of the lawn.
install new 1 hour rated parapet wall at rear wall between 135 kissling rear building and 1526-1532 folsom.
interior tenant improvement - 5 outlets, 2 circuits, put in a small counter for to-go coffee. new pass thru window
altered site permit. revision to pa #2006-0720-7084s. includes revised floor plans for levels 21 thru 36 to illustrate additional 35 units that were created by subdividing existing 2 bedroom designs i...
uniqlo: l1-l2 ellectrical upgrades including new lighting, distribution panel, power and signal devices throughout.
replace 1 header in kind; replace (2) rafters in kind due to dry rot. all work to be performed at 6 sumner st at rear of property. in (e) kitchen add ply to floor 100 sq ft. header at rear wall of bui...
at&t: modification of an unmanned wireless facility - install 2 antennas stacked on new mounted pipes w/ frp dividers. remove/replace 1 power plant, 1 battery cabinet, 6 converters and 6 rectifiers, (...