Building Permits in ZIP 94105
San Francisco, CA — 238 permits filed recently
238 permits
revision to 202410082583 and 202507020012. update 5 columns at level 1 from frp strengthening to steel tube strengthening.
22nd fl: office ti. new partitions, light fixtures, ceilings, millwork, ducting, power and plumbing.
4/fl- add 2 heat pumps, supply fan, exhaust fan, and 3 smoke dampers. (n) ductworks, condenser water piping, ceiling and sidewall grilles, 2 thermostats, and air balance. ref-202602196138
install (n) sink with faucet and water filter in service area.
5/f- revision to pa# 202512111612: division of existing reading room to individual small conference and phone rooms.
5th & 6th/f men's & women's restroom remodel, floors are currently unoccupied, no changes to mech, sprinkler, or fire alarm system. electrical deferred
select demo of non structural partition, doors, tile ceiling, relocation of existing cafe, new mill work, equpiment, finishes and gypsum board soffit, no exterior work, mep deferred. change of use fro...
5/fl-(n) interior ti to include mechanical and electrical . structrual for movable wall. includes mep work
basement and 2nd flr - new power and signal devices in space. ref#: 202512222436 and 202512192339. (electrical sheets)
basement to ground floor - new interconnecting staircase that connects the basement to the ground floor. ref permit 202512192339, and 202512222436. no slab demolition under this permit, opening is exi...
floors 30 & 31: demo only, non-structural partitions, ceiling,finished, mep, ab-17
unit 10b: replacement of shower tiles, waterproofing and tile backing. replacement of shower pan and curb. replace bathroom fan. no replacement of plumbing fixtures. in kind.
all floors: interior tenant improvement to include non-structural partitions, new ceilings, and associated electrical, lighting, plumbing, and new finishes throughout area of work. new millwork elemen...
fl b7: interior renovation retail space w/ new non-structural partitions, storefront, ceiling, lighting, millwork & finishes.
floor 1,3, 8, 11, 12, 17, 18, 20, 21, 22. interior non-strucutural demo of (e) unoccupied floors include removal of walls, ceilings, millworks, finishes, doors, light fixture per ab-017.
21st floor: interior ti - non structural partitions, doors, lighting, accustical ceilings, new finishes, electrical and mechanical.
4th floor: limited interior demo & construction of non-strucutral elements ~ partitions - finishes, electrical outlets, ceiling treatments, lighting & switches & restroom upgrades. scope does not affe...
rev to existing approved permit 2024-1212-6728. to show occupancy loads and call out assembly areas 8th fl. outdoor deck (8300), east patio (8301) breakroom (8246)
revision 202603026778- remove failing eqipment and perform emergency repair work by replacing with (n) fillport equipment.
relocate (e) rooftop mechanical equipment in area of work , remove skylight in area of work, upgrade and extend (e) elevator to rooftop, reconfigure and extend (e) exit stair areas at 6th floor to roo...