Building Permits in ZIP 94108
San Francisco, CA — 147 permits filed recently
147 permits
10/f: tenant improvement. demolition - removal of non-structural partitions and finishes. removal of (e) retail stair finishes. arch - addition of new stair, non-rated drywalls and glazing partitions...
revision to bpa: 202506279718 - demo (e) sub floor including wood sleepers framing, plywood concrete over build. replace new lvl framing and plywood sheating per plan.
ste 2118 21st floor: interior work tenant improvement to an (e) dental office space. scope of work includes new partitions, millwork, interior finishes, lighting, dental equipment and plumbing fixture...
restaurant space: repair drywall approx 60 sq ft for water damage, and plumbing repairs. repair dry rotten plywood on floor approx 2x2 due to water damage. change floor tiles. all work is interior.
revision to bpa# 202511260493. administrative permit to clarify that the entry door does not require panic hardware, include sign above door that states "door shall remain open during business hours."
20/f: revision to permit 202511109312. technical infeasibility request for men's restroom screen.
unit 7d: remove non-structural partition between dining room & living room. remodel kitchen all appliances in (e) locations. remodel 3 full baths and 1 powder 1/2 bath. refinish hardwood floors, paint...
32nd/f: deferred electrical for t.i. 202601284665. lighting, lighting controls, power & wiring devices t.i., new single use gender neutural restroom
roofing - no hotworks.
11th fl - demo non-structural wing walls. install of new power life safety & seismic bracing for 10 new phone booths. restroom & drinking fountain upgrades 20% of construction cost
reroofing: prepare roof for overlay. install 1/2" hd board. install 60mil tpo. no tear off, no resheet. color white 214 sq ft.
35 sq ft bathroom remodel - all in kind, no wall removal.
tenant improvements: existing cafe 928 stockton st. install take out window. added space for new take out ordering room for cafe.
unit # 403: remodel of kitchen and 1 bathrooms with addition of a washer & ventless dryer. electrical - install new can lights, relocate panel out of closet. plumbing new shower valve & tub; shower/dr...
revision to pa 202512121659 unit 204 removal of 2 non-load bearing wall to integrage kitchen & living room areas
change of use from jewelry shop to hair salon. tenant improvement. prep & install new flooring. install ada auto accessible door openers. install lights & electric outlets. interior walls & doors. new...
3rd fl - tenant improvement to include millwork, doors, frames, sidelights, ceiling tiles. mep under separate pertmi
unit 26: to obtain final inspection for work approved under pa#201706209873 all work is complete.
re roofing no hot works
unit #3, #34 and #55: providing openings and carpentry repair for the installations of two gas lines done by others, restoration after install of gas lines, perform ext concrete patch repairs where cr...