Building Permits in ZIP 94109
San Francisco, CA — 286 permits filed recently
286 permits
replacing e fire alarm system to comply with sffc 1103.6.7.1
suite 100: interior non structural, wall, floor and exposed ceiling finishes. mep & fire deferred
replace fire alarm system to meet ca/sf code to add lf horns in units & wireless radio monitor
change of as built room labeling & add 1 heat detector ref pa 202508052359
conversion of (e) unconditioned storage space into (n) 775sf adu with 1 bed & 1 bath,storage room, trash toter enclosure & 1hr hallway connecting the adu to building foyer. (n)wood framed steps on (e)...
scope of work under this permit includes: rebuild existing rear stairway in like kind configureation with new guardrails.
upgrade building space heating from gas to all electric heat pumps within mini splits cassettes in each unit. all 16 heat pumps to be placed on the building's flat roof with new solar panels. battery...
revision to pa #202511189862: new structural reinforcement and foundation work to address existing work.
to comply with nov #202079907. 1) removal of unpermitted cinder blocks atep 20' high retaining wall with no rebar. 2) new 6' high fence setback 3'-0" from property line.
to comply with 202424172- after the fact permit to comply with like for like door replacement. only doors replaced . new doors connected back to (e) powered overhead closers which were not altered/rep...
upgrade existing fire alarm system to comply with sffc section no 3.7.6.1 to meet 75 db in all sleeping areas. ref permit 202501077899.
main floor guest bath remodel, replace in kind, no location changes
unit #7: r/r fire damaged inteiror finishes, windows, electrical, plumbing, ceiling/roof framing and roof materials. unit #5: r/r fire/water damaged interior finishes. all work to return building to o...
revision to pa 202302212276 - add a new bridge connecting the motel to the exterior walkway @ the northeast corner of the hotel, and update walkways. also, the guest bathroom @ rm #535 will be convert...
installation of a new sprinkler monitoring system. (sprinkler waterflow and supervisory system). ref sprinkler permit 202512161879
at&t modification of an existing wireless facility consiting of: lower (2) and add (2) antennas; r/r (2) rrus; install (1) dc9 rays cap, (1) powertrunk, r/r infinity power plant w/7 rectifier; dc surg...
modification of an unmanned existing wireless facility consisting of r/r 3 antennas, remove 1 infinity power plant, 6-48 v rectifies, 4 +24 v rectifiers,relocate 12 190 arl batteries, install 1 512 po...
permit for temporary tower crane erection for new construction high-rise building
fire alarm as built revision to pa#2025-1010-7220 to address inspector comments. added initiating devices
re roofing hot works