Building Permits in ZIP 94109
San Francisco, CA — 287 permits filed recently
287 permits
unit 1104: replace shower wall and floor tiles, repace shower door, and hand sink, replace light fixtures.
unit #1: to remodel shower in bathroom
to obtain final inspection for work approved under pa# 202209092152 & 202209212883. all work is complete.
comply with 202302020 legalize awning under awning amnesty program "l & g"
partial top roofing repair and reinforcement as needed, repair of upper concrete half walls at top roof. repair of back wall (concrete) by patching, crystalize and spacing. restoration of original win...
as built to pa 202504174599 relocate facu into garage, change 29 wired low frequency sounders to wireless. add shunt trip to elevator.
apt 16c: bathroom remodel, all in kind, new tiles, tub, tub valves, vanity, sink, toilet, lights, all fixtures same location.
unit 302: install r-19 insulation in ceiling (420 sq ft). r-13 insulation in walls (300 sq ft). install new drywall 5/8 (900 sq ft) and new flooring (600 sq ft); paint all in-kind. all work interior.
interior renovations on 4 units (#201, #210, #407, #410). reconfigure interior layout w/ 2 bedrooms, kitchen, laundry, living room. relocate non-load bearing walls; in-kind replacement of plumbing and...
garden condo: replace in kind west bathroom fixtures, update plumbing and electrical to code. replace wood flrs in hallway and west bathroom.
suite 210: hvac modifications to support interior tenant improvements. all terminal units are existing to remain. (e) central equipment is existing to remain. (e) controls to remain. ref building perm...
unit 207: master bath: replace only. free standing shower base, shower stall, shower door, corner shelf, trim kit, grab bar like for like. hall bath: tub.shower replace only, free standing tub, shower...
tenant improvement of an existing restaurant and bar, includes new i terior non-structural partitions, finishes, lighting, millwork, and kitchen equipment> replace exterior storefront windows and entr...
remodel kitchen and two baths. exploratory drywall demo to assess existing conditions. no structural work. patch back after demo
to obtain final inspection for work approved under pa#: 202310058093. all work is complete.
to obtain final inspection for work approved under pa#: 202205174400. all work is complete.
voluntary strengthening per ab-094.
2/f suite 210: interior tenant improvement to (e) office space including non-structural partitions, doors, structural operable partition, suspended ceilings, casework, finishes and furniture. no chang...
exterior stairs repair less than 50%, replace new wood in kind, non street visible.
comply w/ nov #202231412 to complete revison work soft story retrofit pa #201510089218 which was suspended. revise foundation & lcoation under shear walls on g/f rear of bldg. replace wood beam w/ new...