Building Permits in ZIP 94114
San Francisco, CA — 404 permits filed recently
404 permits
revision to pa#202511129390 to replace (e) shingles around windows @ beck deck in kind. replace (e) rotten deck ledger in kind, w/ (n) 2x8 p.t.ledger with(n) new flashing & 5/8" dia lag bolts-. reinst...
common area new deck @ rear yard w/staircase. comply with nov #202547109 (item 3).
remove (e) deck & stair to yard. replace with (n) deck & stair.
unit 1- remodel two (e) bathrooms on lower level
to obtain final inspection for work approved under pa# 202501168496. all work is complete.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
remodel and expand (e) 3-story residence.include vert,int mods to create 4-store bldg w/ penthouse and 1 adu unit. scope includes new retianing walls at rear yard to facilitate site access from museum...
to obtain final inspection for work approved under pa 202502210850. all work is complete.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
revision to pa #2025-0702-0072: store front window modifications. replace flexible ducts due to removal of suspended ceiling (no equipment changes), replace lighting fixtures at general location (no c...
1/f: remodel/reconfigure w/ new stairs out to rear yard. 2/f: remodel/reconfigure w/ 2 new dormer shed roofs at rear of house. new mep throughout. garage level to remain.
replace front propertyline fesnce in kind(wood fence and gate)
renovate (e) kitchen & create new bath & laundry closet from kitchen, structural changes include relocate partition wall btwn new bath & kitchen to align with (e) mechanical shaft wall & owners partit...
addressing permit only. the existing address 527 noe st refers to the second-floor unit. link to parcel 3584-073.
reroofing. no hot works
revision pa 202512302979 to include the construction of a new, shallow, perimeter, concrete foundation
to obtain final inspection for work approved under pa#202311291617, 202311291618. all work is complete.
to comply with physical inspection report cc-8712.
kitchen remodel like to like. convert hallway closet to half bath with laundry. all work on second floor
kitchen remodel in-kind, no structural changes.