Building Permits in ZIP 94118
San Francisco, CA — 347 permits filed recently
347 permits
(n) foundation & structural framing to replace (e), reducing garage sf to create room for storage, pantry & bedroom, (n) interior stair, remodel upper level bathroom, (n) closets in primary bedrm, sli...
recommencement and completion of work under pa 202401164016.
at&t: modification of an (e) wireless facility. r/r 7 antennas, removing 6 rrus, r/r 3 rrus, relocating sector c rudomes, and with new power trunks, fiber, conduit, h-frame. r/f 2 cabinets with 11 new...
provide new stairs to replace the existing stair to/from basements. no exerior work. remove/remodel (e) kitchen & bathroom. new washer & dryer closets. remove partition wall between kitchen and dining...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
repair front steps less than 50%
replace vanity in bathroom in kind. new recess lighting in family room. no change to floor layout. no change to wall layout. no structural work.
solar permit: installing 192 solar pv modules, 72 watts per module, total no. of rating 13.824 kw. mounted: roof, ballasted: n | installation of tesla solar roof
unit 404: master bath remodel, converting tub to walk-in shower. bath remodel. subpanel location change. remodel (e) kitchen. add laundry facilities and add 25 recessed lights.
remove and replace kitchen cabinets, install insulation in any exposed exterior walls. repair any drywall removed for plumbing and electrical upgrade.
re-roofing: remove existing roof, install asphalt shingles, no hot works
to obtain final inspection for work approved under pa# 200504281143, 200506074421, 200512029409. all work is complete.
renovation & expansion of (e) 1-story sfd into a 2-story 2752sf sfd and 268sf habitable roof open air roof deck. new construction of reinforced foundation and expansion of erection of structure, hards...
revision to pa # 202211166648: state program adu, remove sprinklers & reverse occupancy per memorandum dated 11.06.2023. adu sprinkler removal & occupancy change reversal.
re-roofing (no hot work)
to comply with dbi complaint #202423121 and planning enforcement case #2024-004227 enf & 2022-012410 enf. to remove e front entranc awning & roller gate. 2nd floor: remove unotherized office use & rev...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
to comply with nov#202651405. barrier removal of (e) restroom.
2/f -open walls as needed to allow insulation to be blown in walls and ceiling, bathroom remodel, ceiling fan, circuits, vent in exterior, remove and intsall shut off under sink.
to obtain final inspection for work approved under pa#: 201709148195 and 201805078402. all work is complete.